Whole-home remodeling · Pacific Palisades 90272

Whole-Home Remodeling in Pacific Palisades, CA

We run a whole-home remodel of a standing Palisades house as one job: kitchen, bathrooms, floors, plumbing, wiring and layout on one schedule, under one project manager and one fixed price. The cabinets come from our own workshop, the permits are filed with LADBS under our license, and the schedule is written into the contract before demolition starts.

Licensed, bonded & insured · CSLB #1148319 Fixed price in writing · 2-year warranty Permits handled

Get your free estimate

60 sec

Takes about a minute. We try to call you back right away.

Step 1 of 4What are you planning?
Step 2 of 4When would you like to start?
Step 3 of 4What budget do you have in mind?

Kitchen remodeling from $20,000. Bathroom remodeling from $15,000. Final pricing depends on scope. Not sure? Choose “Not sure yet.”

Step 4 of 4Where should we send your estimate?

Prefer to talk? (424) 455-64645.0

5.0our rating on Google
#1148319CSLB · licensed, bonded & insured · verify
2-yearwritten workmanship warranty
Fixed pricein writing, before work starts
Since 2008building homes in California

Short answer

Who remodels whole homes in Pacific Palisades?

Kasimov Construction is a licensed general contractor (CSLB #1148319) that remodels whole homes in Pacific Palisades, ZIP code 90272: kitchens, bathrooms, floors, plumbing, wiring and layout in standing houses, under one fixed-price contract. Pacific Palisades is in the City of Los Angeles, so the permits come from LADBS; interior work with no structural changes is on the Express Permit list, and exterior work follows the California Wildland-Urban Interface Code. The team has been in construction since 2008.

Sources: LADBS Express Permits bulletin, WUI code summary, City Planning rebuild FAQ.

Kasimov Construction · Pacific PalisadesKey facts
License
CSLB #1148319, Class B, bonded and general liability insured · verify
Permit office
LADBS (City of Los Angeles) · permit guide
Interior work
No plan check when no walls or openings change: item I.2 of the Express Permit list, issued online as an e-permit (LADBS)
Walls or openings
Counter plan check with existing and proposed floor plans (PermitLA)
Coastal Zone
No coastal development permit for improvements to an existing single-family house (PRC 30610(a)), apart from the classes in 14 CCR 13250
Fire code
California Wildland-Urban Interface Code (formerly Chapter 7A) for exterior work and additions; interior work is not affected (code summary); Very High Fire Hazard Severity Zone since 1999 (City Planning)
The houses
Median year built 1967 in ZIP 90272, about 70% built before 1980 (ACS 2024 5-year); fixtures in a home built in 1994 or earlier are replaced under SB 407
Contract
Fixed price in writing; deposit capped at $1,000 or 10%; written 2-year workmanship warranty

Scope

What does a whole-home remodel involve in a standing Pacific Palisades house?

Inside the house

Most of a whole-home remodel happens inside: the kitchen, the bathrooms, the floors, lighting and storage, and the plumbing and wiring behind them. The houses here are older than they look from the street. In ZIP 90272 the median home was built in 1967 and about 70% of homes predate 1980 (ACS 2024 5-year, Census Reporter), so we expect galvanized supply lines, undersized electrical panels and layers of earlier remodels, and we open test spots during planning so those items are in the fixed price rather than in a change order. In a house built in 1994 or earlier, a permitted remodel also means replacing the non-compliant toilets, showerheads and faucets before the final inspection (SB 407), with new fixtures at the CALGreen flow rates.

On the outside

Pacific Palisades has been a Very High Fire Hazard Severity Zone since 1999 (City Planning). The California Wildland-Urban Interface Code (formerly Chapter 7A) therefore applies to whatever the remodel touches on the exterior: replacement windows get multi-pane glazing with a tempered pane, new vents are ember-resistant, new wall assemblies are ignition-resistant, and a new roof is Class A (LA County code summary). Even a re-roof on the Express Permit list has to use a Class A covering inside the zone (LADBS bulletin, items I.4 and I.5). An addition is built to the same code from the footing up, and our room additions page covers how we tie new framing into an old house.

If the house took smoke

Testing and remediation for lead and asbestos from wildfire smoke is a separate scope, finished and documented before our crew opens a wall. The state recovery package signed on September 15, 2026 (AB 1642 and AB 1795) directs the Department of Toxic Substances Control and the Air Resources Board to write the standards for homes within a fire's ZIP codes and requires insurers to pay for the testing and remediation; the standards are still being written and the release gives no effective date (Office of the Governor). We start the remodel when the clearance documents are in your file.

If the house burned

A rebuild is a different job under different rules: Executive Orders 1, 6 and 8, the fee waiver, soils reports and the LADWP service spec. That is all on our Pacific Palisades fire rebuild page. This page is about the houses that are standing.

Permits

Which permit does each part of a Palisades remodel need?

Pacific Palisades is in the City of Los Angeles, so LADBS issues the permits. The rows below follow the LADBS Express Permits bulletin, PermitLA, the Coastal Act and the wildfire code; we confirm the path for your address in ZIMAS at the first visit.

WorkLADBS pathCoastal ZoneFire codeSources
Interior remodel with no change to walls or openings: kitchen, bathrooms, floors, fixtures, rewiring on existing circuitsExpress Permit, no plan check, issued online as an e-permitNo coastal development permit for improvements to an existing single-family house (PRC 30610(a)), unless a 14 CCR 13250 class applies, such as a house within 50 ft of a coastal bluff edgeNot affectedExpress Permits bulletin, item I.2 · LADBS Express Permits page
Interior remodel that removes or moves a wall or cuts a new openingCounter plan check with existing and proposed floor plansNo coastal development permit for improvements to an existing single-family house (PRC 30610(a)), unless a 14 CCR 13250 class applies, such as a house within 50 ft of a coastal bluff edgeNot affected inside; a new exterior opening gets wildfire-code glazingPermitLA · WUI code summary
Replacement windows and exterior doors, new vents, re-roofPermit per item; a re-roof is on the Express Permit listNo coastal development permit for improvements to an existing single-family house (PRC 30610(a)), unless a 14 CCR 13250 class applies, such as a house within 50 ft of a coastal bluff edgeClass A roof covering, ember-resistant vents, multi-pane glazing with a tempered pane, rated doorsExpress Permits bulletin, items I.4 and I.5 · WUI code summary
Addition or second storyPlan check with architectural and structural drawingsExempt on most parcels under PRC 30610(a); a coastal development permit where a 14 CCR 13250 class applies, such as a 10% increase in floor area on a lot between the sea and the first public roadWildfire-code assemblies for the new exterior, from the footing up14 CCR 13250(b) · WUI code summary

An LADBS permit expires if work does not start within six months of issue, and two years from issue if construction is not complete (LADBS Homeowners Guide); both dates go into the written schedule. Permitted work is inspected before the walls are closed and at final.

How it works

Six steps for a Pacific Palisades house.

The same order on every whole-home job, with the LADBS dates from the Homeowners Guide and the ZIMAS flags for your parcel written into the plan.

  1. 01

    Visit and records

    We walk every room, check the panel, the supply lines and the framing where we can see them, pull the permit history for the house and read the Coastal Zone, bluff and geohazard flags for the parcel on ZIMAS. You get a straight answer on scope and a first range.

  2. 02

    Plan the house, room by room

    Layout, materials and lighting for the whole house at once, so the finishes agree from the kitchen to the last bathroom. You walk through it in 3D before anything is priced, and our workshop draws the cabinets, vanities and built-ins from the same plans.

  3. 03

    One fixed price

    A written contract with the scope line by line, allowances for anything not yet chosen, the exclusions named, the schedule and a deposit under the legal cap. The price moves only with a signed change order.

  4. 04

    Permits and cabinets at the same time

    We file with LADBS under our license: an Express Permit when no walls move, plan check when they do, and we answer the corrections. While the City reviews, the cabinets are built in our workshop, so they are ready when the rough inspections are signed.

  5. 05

    Construction

    Demolition, rough plumbing and electrical, inspections, drywall, tile, floors, cabinets and paint, in a sequence that keeps the house protected and, where you stay in it, a bathroom and a place to cook working. Exterior items are built to the wildfire code. Your project manager sends a written update every week.

  6. 06

    Walkthrough and warranty

    Final inspections, a room-by-room walkthrough, the punch list, the inspection records and care instructions for your file, and a written 2-year workmanship warranty.

Our cabinet shop

One workshop for every room.

A whole-home remodel is where an in-house shop earns its keep. The kitchen cabinets, the vanities, the closets and the built-ins are drawn together, built together in our workshop while LADBS reviews the permit, and installed by the same crew that built them, so the door profiles, the finishes and the hardware agree from room to room.

Changes run directly between you, the job site and the shop. There is no dealer in the middle and no factory lead time holding up the schedule.

2-yearwritten warranty
Since 2008in construction
#1148319CSLB · bonded & insured
About our custom cabinets
Cabinets from our own shopMade to measure
Sizing
Built to your walls, ceiling height and appliances. Stock cabinets typically come in 3-inch steps.
Design
You pick the door style, finish, hardware and what goes inside each drawer.
Fit
Planned around windows, soffits, out-of-square walls and existing plumbing.
Install
Installed by our own crew, the same people who built them.
Changes
Handled directly between you, the job site and the shop. No dealer in the middle.

Reviews

What our clients say.

Google Reviews
5.0

Our rating on Google. Read what clients wrote, or leave a review of your own.

Google
“We hired this team to convert part of our garage into a laundry area, a guest bathroom, and a shower. They did an amazing job! The tile work, wood accent walls, and vanity turned out great. The guys worked very clean and neat, kept the place tidy every day, and finished everything on time. Highly recommend them!”
GeorgiiGoogle review · October 2026Garage conversion: bath and laundry
Google
“Great contractor! Did our apartment bathroom remodel. Clear communication, quality work. Would definitely hire again!”
Vlad IglinGoogle review · October 2026Apartment bathroom remodel
Google
“Excellent work on room renovation! The room looks amazing, and I’m very happy with the results. Highly recommend!”
Artur RyzhkouGoogle review · October 2026Room renovation

All reviews →See them on Google →

Nearby

Also serving areas near Pacific Palisades.

FAQ

Whole-home remodeling in Pacific Palisades, answered.

Call us: (424) 455-6464
Do I need a permit for a whole-home remodel in Pacific Palisades?
Yes, from LADBS, because Pacific Palisades is in the City of Los Angeles. The path depends on the work. A kitchen or bathroom remodel with no structural changes is item I.2 of LADBS's Express Permit list, issued without plan check and online as an e-permit (LADBS Express Permits); replacing plumbing fixtures and rewiring on existing circuits are on the list too. Removing or moving a wall, or cutting a new opening, sends the job to counter plan check with existing and proposed floor plans (PermitLA). We file under our license, and the work is inspected before the walls are closed and at final.
How long does a whole-home remodel of a Palisades house take?
The schedule is written into your contract, and your project manager reports against it every week. On our whole-home remodeling page we give the ranges we see on our jobs: about three to five months of construction when the layout stays, six to nine for a gut to the framing, plus design and permit time before that. Two LADBS dates shape the plan: a permit expires if work does not start within six months of issue, and two years from issue if construction is not complete (LADBS Homeowners Guide). Building the cabinets during plan check keeps the middle of the job from waiting on a factory.
Can I add a second story to my Palisades house?
Often, and it is an addition rather than a remodel: architectural and structural drawings, a check of the existing foundation, LADBS plan check, and the new exterior built to the California Wildland-Urban Interface Code (code summary). The height you can build to depends on the zone and on whether the lot is hillside. As a reference point, the City's EO 8 guidelines summarize the zoning height limit for a non-hillside R1 lot in the Coastal Zone as 33 ft, or 28 ft where the top roof slope is under 25%; other zones, hillside lots and specific plan areas have their own limits, and we read the limit for your parcel in ZIMAS before drawing anything. On most parcels an addition to an existing single-family house needs no coastal development permit (PRC 30610(a)); on a lot between the sea and the first public road, or within 300 ft of a beach, a height increase of more than 10% does (14 CCR 13250(b)(4)). Our room additions page covers the construction side.
Can we stay in the house during the remodel?
In many cases, yes. The job is split into phases: we close off the rooms under construction behind dust walls, keep a bathroom and a place to cook working, and tell you the day before any water or power shutoff. When the whole house comes down to the framing, living elsewhere for the heavy phase is usually shorter and costs less overall, and we say so at the estimate rather than after you sign.
Do you remodel homes with smoke or ash damage from the fire?
Yes, once the house has been tested and cleared. Smoke testing and the lead and asbestos remediation are a separate scope done before our crew opens a wall; the clearance documents go into your project file and we give your adjuster a line-item estimate for the remodel itself. The state rules now being written under AB 1642 and AB 1795 are summarized in the scope section above (Office of the Governor).
Does the Coastal Zone add a review to a remodel of a standing house?
Usually not. The Coastal Act exempts improvements to an existing single-family residence from a coastal development permit (Public Resources Code 30610(a)). The Coastal Commission's exceptions are listed in 14 CCR 13250: a house on a beach, in a wetland, in an environmentally sensitive habitat area or within 50 ft of a coastal bluff edge, a new well or septic system, and, on a lot between the sea and the first public road or within 300 ft of a beach, an increase of 10% or more in floor area or height. A whole-home remodel that stays inside the walls on a parcel without those flags is permitted by LADBS alone. We read the Coastal Zone and bluff flags for your address in ZIMAS at the first visit, and where one applies we tell you which coastal path follows before the design starts.
Is there an HOA to deal with?
It depends on the street. Pacific Palisades includes gated communities and condominiums, for example in the Highlands (neighborhoods as described on Wikipedia); where a home sits in one, the association reviews exterior changes and its rules set work hours and access, and we prepare that application alongside the LADBS permit. Where there is no association, the LADBS permit is the only approval. We ask about CC&Rs at the first visit so the schedule accounts for both.
My house was built in the 1960s. What does that change?
Two things. First, the rules: in a home built in 1994 or earlier, a permitted remodel requires the non-compliant toilets, showerheads and faucets throughout the house to be replaced before the final inspection (SB 407, Civil Code 1101.1 et seq.), with new fixtures at the CALGreen maximums. Second, what is in the walls: a 1960s Palisades house has often been remodeled two or three times, and we look for galvanized supply lines, an undersized panel and earlier work without permits during planning, so the fixed price covers them. The median home in ZIP 90272 was built in 1967 (ACS 2024 5-year), so this is the usual case rather than the exception.

Free estimate

Tell us about your Pacific Palisades house.

The address, what you want to change and whether you plan to live in the house during the work. We'll call to set up a visit and tell you which permit path your address needs.

  • Free estimate visit: we measure and listen
  • Written estimate with a clear scope
  • One project manager from start to finish
  • CSLB #1148319, licensed, bonded & insured
  • 2-year written warranty on workmanship
Step 1 of 4What are you planning?
Step 2 of 4When would you like to start?
Step 3 of 4What budget do you have in mind?

Kitchen remodeling from $20,000. Bathroom remodeling from $15,000. Final pricing depends on scope. Not sure? Choose “Not sure yet.”

Step 4 of 4Where should we send your estimate?

Call Free Estimate