Our process

Our Remodeling Process, Step by Step

Every job follows the same six steps, from the free estimate visit to the warranty. You get the plan in writing before we start.

Licensed, bonded & insured · CSLB #1148319 Fixed price in writing · 2-year warranty Permits handled
House framing during construction
5.0our rating on Google
#1148319CSLB · licensed, bonded & insured · verify
2-yearwritten workmanship warranty
Fixed pricein writing, before work starts
Since 2008building homes in California

Step by step

From the first visit to the final walkthrough.

  1. 01

    Free estimate visit

    We visit your home, measure, check what we can of the plumbing, wiring and framing, and talk through what you want and your budget. You'll get a straight answer on whether the project makes sense and roughly what it will cost.

  2. 02

    Plan & design

    We draw the layout, put together cabinet drawings and help you choose materials. You see it in 3D and approve it before we finalize the price. Changes at this stage are free and easy.

  3. 03

    Fixed price & contract

    You get one written contract with a fixed price, a written schedule, allowances listed line by line and a 2-year workmanship warranty. The price only changes if you change the scope.

  4. 04

    Permits & cabinets at the same time

    We submit the drawings to the city and handle the corrections. While the permit is in review, your custom cabinets are built in our shop, so you don't lose months waiting on a factory.

  5. 05

    Construction

    Demo, framing, rough plumbing and electrical, inspections, drywall, tile, cabinets and finishes. Your project manager is on it from start to finish, sends weekly written updates and schedules every inspection. We protect your floors, put up dust walls and clean up every day.

After the build

Walkthrough and warranty.

Walkthrough & warranty

We go room by room with you, fix everything on the punch list and give you care instructions for your new materials and a written 2-year workmanship warranty. If something comes up later, you call the same number.

Why the order matters

Most remodel problems come from doing things in the wrong order: cabinets ordered before the room is measured, permits filed after demo, a price that keeps growing because the scope was never pinned down. We finish the design before we fix the price, fix the price before demo, and start the cabinets while the permit is in review. For the rules every California home improvement contract has to follow, see how to hire a contractor in Los Angeles.

Every step is agreed in writing before work starts.

Free estimate

Start with a free estimate visit.

It takes about an hour. You'll know the scope, a realistic price range and the timeline, whether you hire us or not.

  • Free estimate visit: we measure and listen
  • Written estimate with a clear scope
  • One project manager from start to finish
  • CSLB #1148319, licensed, bonded & insured
  • 2-year written warranty on workmanship
Step 1 of 4What are you planning?
Step 2 of 4When would you like to start?
Step 3 of 4What budget do you have in mind?

Kitchen remodeling from $20,000. Bathroom remodeling from $15,000. Final pricing depends on scope. Not sure? Choose “Not sure yet.”

Step 4 of 4Where should we send your estimate?

Call Free Estimate