Whole-home remodeling · Los Angeles

Whole-Home Remodeling in Los Angeles

We remodel houses, condos and apartments as one project with one crew. Cabinets come from our own shop, and the work runs on a written schedule.

Licensed, bonded & insured · CSLB #1148319 Fixed price in writing · 2-year warranty Permits handled

Get your free estimate

60 sec

Takes about a minute. We try to call you back right away.

Step 1 of 4What are you planning?
Step 2 of 4When would you like to start?
Step 3 of 4What budget do you have in mind?

Kitchen remodeling from $20,000. Bathroom remodeling from $15,000. Final pricing depends on scope. Not sure? Choose “Not sure yet.”

Step 4 of 4Where should we send your estimate?

Prefer to talk? (424) 455-64645.0

5.0our rating on Google
#1148319CSLB · licensed, bonded & insured · verify
2-yearwritten workmanship warranty
Fixed pricein writing, before work starts
Since 2008building homes in California

Short answer

Who runs whole-home remodels in Los Angeles, and how?

Kasimov Construction is a licensed general contractor (CSLB #1148319, Class B, bonded and insured) that remodels whole houses and condos across Los Angeles with one crew. It plans the work room by room, shows it in 3D, fixes a written price and files the permits. Kitchen and bath cabinets come from its own workshop, and a project manager sends a written update every week. A refresh usually takes three to five months and a full gut six to nine, with a written 2-year workmanship warranty.

Whole-Home Remodeling · Los AngelesKey facts
License
CSLB #1148319, Class B, bonded and insured · verify
Permit office
LADBS Express Permit for kitchen and bath work with no structural changes; plan check when walls move; filed by our team · which office covers your address
Timeline
Three to five months of construction for a refresh; six to nine for a full gut, plus planning and permits
Price
Fixed in writing after the visit and the design, room by room · market figures
Warranty
Written 2-year workmanship warranty

How we run a whole-home remodel.

A whole-home remodel is several jobs at once. There's the kitchen, the bathrooms, the floors, the plumbing and electrical, storage and lighting. If each one has its own contractor, you end up managing the gaps between them. We run it as one job with one schedule, and your project manager sends you a written update every week.

We remodel single-family houses, condos and apartments, including the HOA paperwork. Jobs range from a phased refresh to a full gut down to the studs. Our team handles planning, city permits, custom cabinets from our own shop and construction under a single fixed-price contract. Our crew has been building since 2008, and we do the floors, walls, tile and paint with the same care as the framing and systems.

What's included

Everything handled by our crew.

Planning, permits, construction and cleanup on one contract, with one project manager.

01

Design

  • Planning room by room
  • Materials & finishes
  • 3D visualization
  • Drawings for the permit
02

Cabinetry

  • Kitchen & bath cabinets from our shop
  • Closets & built-ins
  • Doors, trim & casing
  • Built in our shop during plan check
03

Build

  • Multi-room work in sequence
  • Plumbing, electrical, HVAC
  • Drywall, plaster, flooring, tile
  • Inspections scheduled by us
04

Finish

  • Cabinet & fixture install
  • Paint & touch-up
  • Punch list walkthrough
  • 2-year workmanship warranty
Whole-Home Remodeling

Kitchen, baths, floors and systems on one schedule.

What we build

From a phased refresh to a full gut.

Whole-house remodels

Kitchen, baths, floors, lighting and storage planned together. The finishes match from room to room, and the house doesn't look like it was redone one piece at a time.

Condo & apartment remodels

Full-unit remodels with the HOA side handled. We review the rules, provide insurance certificates, work within elevator and hour limits and keep the hallways clean for your neighbors.

Gut renovations

When the house needs it, we take it down to the studs and put in new plumbing, wiring and a new layout, with the engineering and permits done properly.

Finish carpentry and surfaces

Trim, interior doors, flooring transitions and plaster repair, planned with the cabinetry so profiles and finishes match from room to room. Tile, hardwood, engineered wood and LVP floors, and interior paint with proper prep, patching and sanding before any color goes on.

Choosing

Refresh or gut, stay or move out: how the options compare.

The two decisions that set the shape of a whole-home remodel, with what each one means for the schedule and the permit.

OptionBest forWatch out forEffect on schedule and permit
RefreshA sound layout and systems: new kitchen, baths, floors, lighting and paint in the rooms as they are.Older wiring and plumbing stay in the walls unless the scope says otherwise, so we check them before demo.Shorter schedule; kitchen and bath work with no structural changes can run on an Express Permit.
Gut remodelHouses that need new plumbing, wiring and a new layout, or that have been patched many times.More unknowns behind the walls, so the pre-demo checks matter more. Moving out is usually the practical choice.Longest schedule; plan check for any wall or opening changes, with engineering where structure moves.
Phased, living at homeFamilies who cannot move out, in a house with a second bath and a corner for a kitchenette.Dust walls, daily cleanup and utility shutoffs, and the work runs area by area, which stretches the calendar.Each phase has its own rough and final inspections; the permit path does not change.
Move out for the heavy phaseGut remodels and jobs where every room is touched at once.Rent or a second household for the duration, and the house is not available to you.Fastest construction schedule, with trades working in parallel; the permit path does not change.

No prices in this table: your written estimate prices the scope you pick, room by room. We tell you at the estimate visit when moving out would cost less overall.

The sequence

A whole-home remodel, stage by stage.

The order our crew works in, where the inspections fall and what the house looks like while it happens.

StageWhat happensInspectionWhat you notice at home
Demo and protectionFloors, stairs and the rooms not in scope are covered and sealed off with dust walls. Fixtures, cabinets and finishes come out.Not usuallyNoise and a dumpster for a few days. Water and power shutoffs are announced ahead of time.
Structural and framingWalls move or come out, new beams and posts go in, and openings are framed.Rough framing, where structure changesOpen framing and the new layout you can walk through for the first time.
Rough plumbing, electrical, HVACNew supply and drain lines, circuits, panel work if needed, ducts and vents in the open walls.Groundwork, if drains move under the slabTrenches or slab cuts for a short time, and walls full of pipe and wire.
Rough inspectionsThe city checks framing, plumbing, electrical and mechanical before anything is covered.RoughA pause of a day or two per area while the inspector signs off.
Insulation and drywallInsulation goes in, then drywall, taping and texture or plaster.Not usuallyRooms become rooms again. Dust is heaviest in this stage.
Tile and waterproofingShower pans and membranes first, flood-tested, then tile on floors and walls.Not usuallyShowers stay out of use through the test and the cure times.
Cabinets and counters from the shopCabinets built during permit review are installed and scribed to the walls, then the counters are templated and set.Not usuallyThe kitchen takes shape within days, and the counters follow after templating.
FinishesFlooring, doors, trim, paint, fixtures, lighting and hardware.Not usuallyThe house looks finished before it is signed off.
Final inspection and walkthroughThe city closes the permit. We walk every room with you and finish the punch list.FinalThe paperwork is handed over: inspection record, care instructions and the written 2-year warranty.

Inspection stages follow the LADBS Homeowners Guide (groundwork, rough and final). Cities with their own building departments may add stages, and we confirm the sequence for your address.

Before demo

What we check before demo in an older LA house.

Most of the surprises in a whole-home remodel are behind the walls, and most of them can be found before the price is fixed. At the estimate visit and during planning we look for these, and anything we find goes into the scope rather than into a change order later.

  • Panel capacity. Whether the electrical panel can carry a new kitchen, baths and HVAC, or needs an upgrade.
  • Galvanized supply lines. Old steel water pipe that narrows and rusts from the inside, often replaced while the walls are open.
  • Cast-iron drains. Original drain lines that may be cracked or scaled, checked where we can get access.
  • Knob-and-tube wiring. Early ungrounded wiring, replaced in any room we open.
  • Framing and dry rot. Soft framing at windows, sills and under old bathrooms.
  • Out-of-square walls. Measured so cabinets, tile layouts and doors are planned to the real room.

How it works

How your project runs.

Same five steps on every job, written down and shared with you before demo day.

See the full process →
  1. 01

    Free estimate visit

    We come out, measure, look at the existing plumbing and wiring, and talk about what you want and what it should cost.

  2. 02

    Plan & design

    We draw the layout, help you pick materials and show it in 3D, so you know exactly what you're getting before anything is ordered.

  3. 03

    Fixed price & permits

    You get a written contract with a fixed price and schedule. We file the permits, and your cabinets go into production in our shop at the same time.

  4. 04

    Construction

    Your project manager runs the job, sends a written update every week and keeps the house protected and the site clean.

  5. 05

    Walkthrough & warranty

    We walk every room with you, finish the punch list and hand you a written 2-year workmanship warranty.

Written contract

One fixed price, written down before demo.

Your contract lists the scope line by line, with allowances for anything you have not picked yet and the exclusions named. The price changes only if you change the scope, and then only through a change order you sign before the extra work starts.

Payments follow the schedule in the contract: a deposit capped by California law, then progress payments tied to completed stages, each with a lien release. Nothing is billed ahead of the work.

How the contract and schedule work
What is in your fixed priceWritten contract
Scope
Every line item written out: demolition, each trade, cabinets, counters, finishes and cleanup.
Allowances
Listed line by line for anything you have not picked yet, such as tile or a faucet. The difference is settled in writing.
Exclusions
Named in the contract, so nothing is assumed on either side.
Change orders
Only in writing, signed before any extra work starts, with the change in price and schedule.
Payment schedule
Follows B&P 7159.5: the deposit is capped at $1,000 or 10% of the contract price, whichever is less, and each later payment is tied to completed work.
Lien releases
Provided with each payment, so no supplier or trade can claim against your home.

Inspections

Which inspections happen, and when.

What the city checks at each stage of a permitted home remodel, and what it looks like from your side of the dust wall.

StageWhat the inspector checksWhat you notice at home
GroundworkNew drain lines under the slab and footings for any new structure, before they are covered.Trenches or slab cuts stay open until the sign-off, usually early in the job.
RoughFraming, plumbing, electrical and HVAC in every open wall and ceiling, before insulation and drywall. A phased job can have more than one.Whole areas of the house stay open for a few days while each trade finishes and the inspection is scheduled.
FinalFixtures, outlets, ventilation and the finished work in every room against the approved plans.The permit is closed. You get the inspection record, care instructions and the written warranty.

Sources: LADBS Homeowners Guide to Permits and Inspections (groundwork, rough and final inspections; work is inspected before it is covered). Burbank, Glendale, Pasadena, Beverly Hills, Santa Monica, Culver City and Calabasas inspect under their own departments, and we confirm the sequence for your address before work starts.

Permits & rules

Permits and rules for a whole-home remodel.

Whether a kitchen or bathroom remodel needs a permit, and which kind, depends on where you live and what changes. Here is how it works in Los Angeles. We confirm the exact path for your address before your estimate is final.

City of Los Angeles (LADBS)

  • No structural changes: a residential kitchen or bathroom remodel without structural changes is on LADBS's Express Permit list, so there is no plan check. Replacing plumbing fixtures and rewiring on existing circuits are on the list too.
  • Walls or openings change: the online combined permit excludes changes to walls or openings. Those go to counter plan check with existing and proposed floor plans.
  • Inspection: permitted work is inspected before walls are closed and at final.

Cities with their own building departments

Burbank, Glendale, Pasadena, Beverly Hills, Santa Monica, Culver City and Calabasas each issue their own permits, with their own rules and timelines. See your area page for local specifics.

California water-efficiency rules

  • Homes built in 1994 or earlier: under SB 407 (Civil Code §1101.1 et seq.), a permitted remodel requires replacing non-compliant plumbing fixtures before final inspection. That means toilets over 1.6 gpf, showerheads over 2.5 gpm and faucets over 2.2 gpm.
  • New fixtures must meet CALGreen maximums:
    • toilets: 1.28 gallons per flush;
    • showerheads: 1.8 gpm;
    • bathroom faucets: 1.2 gpm;
    • kitchen faucets: 1.8 gpm.

Your deposit is capped by law

For home improvement contracts in California, the down payment may not exceed $1,000 or 10% of the contract price, whichever is less (Business & Professions Code §7159.5). Our contracts follow that rule.

Permit time limits

Per the LADBS Homeowners Guide, an LADBS permit expires if work does not start within six months of issue and two years from issue if construction is not complete. Both dates go into your written schedule.

Check which office permits your address →

Sources: LADBS Express Permits bulletin P/GI 2026-003, PermitLA, LADBS Homeowners Guide to Permits and Inspections, SB 407 analysis (CSLB), CALGreen fixture table (HCD), Business & Professions Code §7159.5.

Cost

What a whole-home remodel costs in Los Angeles.

We price your remodel room by room from your scope, then fix the total in the contract.

Get a price range for your project.

Every project is different, so we don't use a price list. Tell us about yours and we'll give you a range that fits your home. It's free and takes about two minutes.

  • A realistic range for your specific scope
  • What will move your number up or down
  • A first range from your answers, before any visit
Get My Estimate

See published cost per square foot for whole-home remodels →

What drives the cost.

  • How much layout changesMoving walls, kitchens and bathrooms adds structural, plumbing and electrical work. Keeping the kitchen and baths where they are saves the most.
  • Systems ageOld electrical panels, galvanized pipe and old HVAC either get reused or replaced. We check them during planning, before demo starts.
  • Cabinetry scopeA kitchen and two baths take fewer shop hours than a house full of built-ins. Our shop is in-house, so there's no dealer markup.
  • Finish levelPorcelain or natural stone, standard or designer fixtures. We plan to the level you pick and keep it consistent across rooms.
  • Occupied or emptyLiving in the house during a remodel means phasing, protection and daily cleanup, which adds time. Sometimes moving out for the heavy phase costs less overall, and we'll tell you when that's the case.

More of our work

Interiors by our crew.

Work by our crew. Locations are not shown.

Dressing room with glass wardrobes, light lines and oak floor Black marble floor, onyx wall and a floating walnut bench Corridor with recessed light lines and oak floors Hallway with black marble floor and walnut panels Powder room with black and gold marble and a stone sink Corner whirlpool tub with brass fixtures and black marble Flush hidden doors and light lines in a narrow hallway Hallway with a textured plaster feature wall and a light line Wood sauna with LED-lit benches and a geometric ceiling Sauna with tiered cedar benches and a stone heater wall Spa lounge with wood loungers, a salt wall and the pool behind glass Relaxation room with a backlit salt-brick wall and wood loungers Hammam with a heated marble bench and mosaic walls Open kitchen with an island, chevron oak floor and sconces Bedroom with a curved bed, chandelier and paneled walls Staircase with step lights and a glass railing at dusk Entry hall with a chandelier, chevron oak floor and a glass staircase Vertical radiator beside wall moldings and stairs Walnut wall panels with a textured plaster strip and floating shelves Walnut headboard wall with a textured plaster panel Kitchen cabinetry in walnut and white during installation Built-in white wardrobe and shelving next to a window seat Walk-in closet with oak shelving, drawers and hanging space Entry hall with paneled walls, a lit tray ceiling and crystal light Long hallway with a lit tray ceiling, paneling and a slatted divider Grand staircase with a red runner, marble floor and classic moldings Room with wall moldings, a crystal ring chandelier and a light line Hallway with lit shelving and recessed lighting Living room with a light sofa, sheer curtains and a dining area Spiral staircase with oak treads and a wrought-iron railing Floating oak stairs with a glass railing Staircase with black glass panels and oak treads Kitchen with handleless cabinets and a marble-look backsplash Living room with a round table, mirror panel and city view Olive sofa under brass wall sconces and molding panels Hallway with flush closets and alabaster sconces Octagon and dot porcelain tile floor

Reviews

What our clients say.

Google Reviews
5.0

Our rating on Google. Read what clients wrote, or leave a review of your own.

Google
“We hired this team to convert part of our garage into a laundry area, a guest bathroom, and a shower. They did an amazing job! The tile work, wood accent walls, and vanity turned out great. The guys worked very clean and neat, kept the place tidy every day, and finished everything on time. Highly recommend them!”
GeorgiiGoogle review · October 2026Garage conversion: bath and laundry
Google
“Excellent work on room renovation! The room looks amazing, and I’m very happy with the results. Highly recommend!”
Artur RyzhkouGoogle review · October 2026Room renovation
Google
“Great contractor! Did our apartment bathroom remodel. Clear communication, quality work. Would definitely hire again!”
Vlad IglinGoogle review · October 2026Apartment bathroom remodel

All reviews →See them on Google →

Glossary

Words you will hear on a home remodel.

The terms in your estimate, your contract and your inspection card, in plain words.

TermWhat it means
Gut remodelA remodel that takes rooms down to the framing so the plumbing, wiring and layout can be replaced.
Phased remodelWork split into stages so you can live in one part of the house while another is under construction.
Rough-inPipes, wires and ducts installed inside open walls and floors before drywall. They are checked at the rough inspection.
Punch listThe list of small fixes agreed at the walkthrough and finished before the job is closed.
Notice of CompletionA document you can record with the county when the job is done. Recorded within 15 days of completion, it shortens the time anyone who worked on or supplied the job has to file a mechanics lien (CSLB).
Permit expiryAn LADBS permit expires if work does not start within six months of issue and two years from issue if construction is not complete (LADBS Homeowners Guide).

Sources: LADBS Homeowners Guide to Permits and Inspections, CSLB, How to Prevent a Mechanics Lien. The other terms are trade usage as we apply it on our jobs.

FAQ

Whole-Home Remodeling questions, answered.

Call us: (424) 455-6464
How much does it cost to remodel a whole house in Los Angeles?
It depends more on scope than on square footage. How much the layout changes, the age of the systems and the finish level drive the price. Tell us about your home and we'll send a realistic range, room by room. Whatever we agree on is fixed in the contract before work begins. For published market figures, see our whole-home remodel cost guide.
Can you remodel a condo or apartment?
Yes, and we handle the HOA side, which is the part most owners dread. Rules review, insurance certificates, elevator reservations, work-hour limits and protecting common areas are all part of our contract.
Can we live in the house during the remodel?
Often yes, with a phased plan. We seal off and finish one area while you live in another, keep one bathroom and a working kitchen corner going, and schedule utility shutoffs ahead of time. For a gut down to the studs, moving out is usually faster and cheaper, and we'll tell you so.
How long does a whole-home remodel take?
A refresh usually takes three to five months of construction. A full gut takes six to nine, plus planning and permits before that. We build the cabinets in our own shop while permits are in review, so the job doesn't stop halfway through to wait on cabinets.
What if you find problems inside the walls?
In older LA homes we usually find something, like old leaks, undersized electrical panels or bad wiring. We check for the likely problems during planning. If something new turns up, we show you what we found and price it clearly before we do the work.
Can you remove a load-bearing wall?
Yes. A structural engineer sizes the beam and the posts that carry the load, and the calculations go in with the drawings. The LADBS Express Permit list excludes structural changes, so the job goes to plan check instead. The new beam is inspected at rough framing before the ceiling is closed, and the finished opening is checked at final. We tell you at the estimate visit whether the wall you want gone is carrying anything.
How are payments scheduled?
The deposit is capped by California law at $1,000 or 10% of the contract price, whichever is less. After that, your contract lists progress payments tied to completed milestones, and under the CSLB rules a payment may not exceed the value of the work done or the materials delivered. Each payment comes with lien releases. Nothing is billed ahead of the work.
What is a change order and an allowance?
Your contract has one fixed price, a written schedule, allowances listed line by line and a 2-year workmanship warranty. An allowance is the budget line for an item you have not chosen yet, such as tile or a faucet; when you pick it, the difference is settled in writing. A change order is a written agreement you sign before any extra work starts, with the change in scope, price and schedule. The price only changes if you change the scope.
Which inspections will happen?
Permitted work is inspected before it is covered and again at the end. The LADBS Homeowners Guide describes groundwork, rough and final inspections, and your project manager schedules each one and tells you the day before. In a whole-home remodel there can be several rough inspections as areas are phased: groundwork for new drains and footings, rough for framing, plumbing, electrical and HVAC in each open area, and a final for the whole house. Nothing is closed up until its inspection is signed.
How much is the deposit?
California law caps the down payment on a home improvement contract at $1,000 or 10% of the contract price, whichever is less. After that, you pay as the work gets done, on the schedule written in your contract.
Are you licensed and insured?
Yes. Kasimov Construction is a licensed California general contractor, CSLB #1148319 (Class B), bonded and insured. You can verify the license on the CSLB website, and we send certificates of insurance before work starts.
Is there a warranty?
Yes. Every project comes with a written 2-year workmanship warranty. The manufacturer warranties on materials and fixtures also apply, and we hand you the paperwork for all of it at the end of the job.

Free estimate

Tell us about your home and get a free estimate.

Answer a few quick questions and we'll call you to set up a free estimate visit. Rather talk now? Give us a call.

  • Free estimate visit: we measure and listen
  • Written estimate with a clear scope
  • One project manager from start to finish
  • CSLB #1148319, licensed, bonded & insured
  • 2-year written warranty on workmanship
Step 1 of 4What are you planning?
Step 2 of 4When would you like to start?
Step 3 of 4What budget do you have in mind?

Kitchen remodeling from $20,000. Bathroom remodeling from $15,000. Final pricing depends on scope. Not sure? Choose “Not sure yet.”

Step 4 of 4Where should we send your estimate?

Call Free Estimate