Short answer

How much does a whole-home remodel cost in Los Angeles?

HomeGuide's 2026 guide puts a complete home renovation in Los Angeles at $20 to $95 per square foot, and a full gut to the studs at $60 to $150 per square foot nationally. Kitchens and bathrooms run $100 to $250 per square foot. In the 2025 Cost vs. Value Report for Los Angeles, a major midrange kitchen averages $86,214 and a midrange bath $27,143. HomeAdvisor notes that rooms with plumbing cost the most to redo.

Whole-home remodels in LAKey facts
Complete renovation, LA
$20 to $95 per sq ft (HomeGuide)
Gut to the studs
$60 to $150 per sq ft (HomeGuide, national)
Kitchens and baths
$100 to $250 per sq ft (HomeGuide, national)
Major midrange kitchen, LA
$86,214 (Cost vs. Value 2025)
Midrange bath, LA
$27,143 (Cost vs. Value 2025)
Typical length
2 to 8 months for a 3-bedroom house (HomeGuide)

By level

Whole-home remodel cost by level and per square foot.

LevelWhat it usually includesPublished figure
Low-end (cosmetic)Paint, trim, molding, flooring, stock cabinets, basic appliances and counters.$15,000 to $40,000 total (HomeGuide, national).
Mid-rangeThe above plus better materials, a full kitchen and bathroom remodel, new lighting and hardwood floors.$40,000 to $75,000 total (HomeGuide, national).
High-endCustom cabinetry and built-ins, layout changes, structural and foundation repair, new HVAC and roof.$75,000 to $200,000 total (HomeGuide, national). HomeAdvisor: $150 per sq ft or more with high-end materials.
Whole-house remodel, per sq ftAcross the levels above, without gutting the house.$15 to $60 per sq ft (HomeGuide and HomeAdvisor, national).
Gut to the studsDemolition, structural work, new electrical and plumbing, roof, HVAC, appliances and finishes.$60 to $150 per sq ft (HomeGuide, national).
Complete renovation, Los AngelesHomeGuide's range for Los Angeles.$20 to $95 per sq ft.
Kitchens and bathroomsPer square foot of those rooms.$100 to $250 per sq ft (HomeGuide, national).

Sources: HomeGuide (December 2025), HomeAdvisor (June 2026, Los Angeles average renovation $47,200) and Angi (May 2026, $15 to $150 per sq ft). These are national averages, some adjusted for cities, and they cover everything from cosmetic updates to full remodels. HomeGuide notes that costs rise significantly in high-cost cities and in homes over 100 years old. Kasimov Construction doesn't publish a price list. You get a written fixed price for your project after a free estimate visit.

Los Angeles data

What the biggest rooms cost in Los Angeles (2025).

Project (as defined by the report)Average job cost · Los AngelesWhat it typically means
Minor kitchen remodel (midrange)$29,765An update that keeps the existing layout: new cabinet fronts, counters, sink and faucet, appliances, flooring and paint.
Major kitchen remodel (midrange)$86,214A full remodel of an outdated kitchen with new semi-custom cabinets and an island.
Major kitchen remodel (upscale)$171,369A full remodel with custom cabinets, stone counters, built-in appliances and upgraded lighting.
Bath remodel (midrange)$27,143An update of an existing small bathroom: new fixtures, tile, vanity, lighting and finishes.
Bath remodel (universal design)$44,580Accessible upgrades: curbless shower, grab bars, comfort-height fixtures, wider clearances.
Bath remodel (upscale)$85,055A larger primary bath with high-end tile, a double vanity with a stone top, a separate shower and premium fixtures.

Source: Cost vs. Value Report 2025, Los Angeles (Zonda / Journal of Light Construction). Averages for standardized projects.

A worked example from these averages: one major midrange kitchen ($86,214) and two midrange baths (2 × $27,143) add up to $140,500. That's before floors, paint, lighting, electrical, plumbing upgrades or any change to the layout. This adds up the report's averages. It isn't a price for your home.

Scope

What does a whole-home remodel include?

  • Kitchen and bathrooms. Cabinets, counters, tile, fixtures, waterproofing and ventilation.
  • Floors, walls and paint. Flooring throughout, drywall or plaster repair, trim and doors.
  • Electrical and lighting. New circuits and lighting, and the panel if it can't carry the new load.
  • Plumbing. Supply and drain lines in the rooms that are opened up, and old galvanized pipe where it's found.
  • HVAC, roof, windows and doors. Included when the scope calls for them. HomeGuide's gut-remodel figure includes a new roof and HVAC.
  • Design, engineering and permits. Drawings, structural calculations when walls move, the energy report and city fees.

Ask every contractor whether appliances, permit fees, temporary housing and repairs found behind the walls are in the price. HomeAdvisor tells homeowners to budget for temporary housing when a renovation makes the home unlivable.

Permits

Permits for a whole-home remodel in Los Angeles.

City of Los Angeles (LADBS)

  • No structural changes: kitchen and bathroom remodels without structural changes, fixture replacement and rewiring on existing circuits are on the LADBS Express Permit list, with no plan check.
  • Walls, openings or additions: these go through plan check with existing and proposed floor plans (PermitLA).
  • Trade permits: plumbing, electrical and heating work that isn't part of the building permit gets its own permits (LADBS homeowners guide).
  • Inspections: work is inspected before it's covered and again at final.
  • Time limits: a permit expires if work doesn't start within six months, and two years after it's issued if the work isn't finished.
  • Fees: LADBS calculates plan check and permit fees from the project valuation. The LADBS fee estimator gives a first number.
  • Fire sprinklers: if alterations within one year cost more than 50% of the home's replacement cost, the City's residential code can require sprinklers in the house (LADBS bulletin P/BC 2026-150, citing LAMC 91.5.309.2).

Other cities

Burbank, Glendale, Pasadena, Beverly Hills, Santa Monica, Culver City and Calabasas issue their own permits. Look up your permit office.

Fixture rules

The SB 407 fixture rule for older homes.

If your house was built in 1994 or earlier, SB 407 (Civil Code §1101.1 et seq.) requires non-compliant plumbing fixtures to be replaced as a condition of final approval on a permitted remodel. That covers:

  • toilets that use more than 1.6 gallons per flush;
  • showerheads over 2.5 gallons per minute;
  • faucets over 2.2 gallons per minute.

In a single-family home the rule applies to every fixture in the house, including rooms you aren't remodeling. Repairs and maintenance don't trigger it. New fixtures have to meet CALGreen maximums: 1.28 gallons per flush for toilets, 1.8 gpm for showerheads, 1.2 gpm for bathroom faucets and 1.8 gpm for kitchen faucets.

Timeline

How long does a whole-home remodel take?

ScopeTypical lengthSource
Cosmetic refresh1 week to 2 monthsHomeGuide
Complete renovation of a 3-bedroom house2 to 8 months, plus about a month for planning, permits and custom ordersHomeGuide
Whole-home refresh3 to 5 months of constructionOur typical schedule
Full gut to the studs6 to 9 months of constructionOur typical schedule

Sources: HomeGuide and our typical schedules. Planning, design and permits come before construction. An LADBS permit expires if work doesn't start within six months of issue.

Price drivers

What moves the number up or down.

  • How much layout changes. Moving walls, kitchens and bathrooms adds structural, plumbing and electrical work. Keeping the kitchen and baths where they are saves the most.
  • Systems age. Old electrical panels, galvanized pipe and old HVAC either get reused or replaced. We check them during planning, before demo starts.
  • Cabinetry scope. A kitchen and two baths take fewer shop hours than a house full of built-ins. Our shop is in-house, so there's no dealer markup.
  • Finish level. Porcelain or natural stone, standard or designer fixtures. We plan to the level you pick and keep it consistent across rooms.
  • Occupied or empty. Living in the house during a remodel means phasing, protection and daily cleanup, which adds time. Sometimes moving out for the heavy phase costs less overall, and we'll tell you when that's the case.
  • Age of the house. HomeGuide notes higher costs in homes over 100 years old.
  • Fixture rule. In a home built in 1994 or earlier, SB 407 adds every non-compliant toilet, showerhead and faucet to the job.
  • Size of the alteration. In the City of LA, work over 50% of the home's replacement cost in a year can trigger fire sprinklers.

FAQ

Whole-home remodel questions.

Call us: (424) 455-6464
How much does a whole-home remodel cost per square foot in Los Angeles?
HomeGuide puts a complete home renovation in Los Angeles at $20 to $95 per square foot. Nationally it lists $60 to $150 per square foot for a gut to the studs and $100 to $250 per square foot for kitchens and baths. How many kitchens and bathrooms you redo, and whether the layout changes, set most of your number. Kasimov Construction doesn't publish a price list. You get a written fixed price for your project after a free estimate visit.
Do I need a permit for a whole-home remodel in LA?
Yes for work that touches structure, plumbing, electrical or HVAC. In the City of Los Angeles, a remodel with no structural changes can often use LADBS Express Permits with no plan check. Moving walls or openings needs plan check. Burbank, Glendale, Pasadena and other cities issue their own permits.
Do I have to replace all my toilets and faucets?
If the house was built in 1994 or earlier, a permitted remodel triggers SB 407. In a single-family home, every non-compliant toilet, showerhead and faucet has to be replaced before final approval, including rooms you aren't remodeling.
How long does a whole-home remodel take?
A refresh usually takes three to five months of construction. A full gut takes six to nine, plus planning and permits before that. We build the cabinets in our own shop while permits are in review, so the job doesn't stop halfway through to wait on cabinets.
Can we live in the house during the remodel?
Often yes, with a phased plan. We seal off and finish one area while you live in another, keep one bathroom and a working kitchen corner going, and schedule utility shutoffs ahead of time. For a gut down to the studs, moving out is usually faster and cheaper, and we'll tell you so.
What if you find problems inside the walls?
In older LA homes we usually find something, like old leaks, undersized electrical panels or bad wiring. We check for the likely problems during planning. If something new turns up, we show you what we found and price it clearly before we do the work.

Free estimate

Get a real number for your home.

Per-square-foot averages are a starting point. We price your remodel room by room after the estimate visit and fix the total in the contract.

  • Free estimate visit: we measure and listen
  • Written estimate with a clear scope
  • One project manager from start to finish
  • CSLB #1148319, licensed, bonded & insured
  • 2-year written warranty on workmanship
Step 1 of 4What are you planning?
Step 2 of 4When would you like to start?
Step 3 of 4What budget do you have in mind?

Kitchen remodeling from $20,000. Bathroom remodeling from $15,000. Final pricing depends on scope. Not sure? Choose “Not sure yet.”

Step 4 of 4Where should we send your estimate?

Call Free Estimate