Fire rebuild · Pacific Palisades 90272

Fire Rebuild Contractor in Pacific Palisades, CA

We rebuild homes lost in the Palisades Fire from a cleared lot to a certificate of occupancy: survey and soils, plans by licensed architects and engineers, LADBS permits under Executive Order 1 or 8, construction to the California Wildland-Urban Interface Code, cabinets from our own workshop, one fixed price in writing.

Licensed, bonded & insured · CSLB #1148319 Fixed price in writing · 2-year warranty Permits handled
House framing during construction
5.0our rating on Google
#1148319CSLB · licensed, bonded & insured · verify
2-yearwritten workmanship warranty
Fixed pricein writing, before work starts
Since 2008building homes in California

Short answer

Who rebuilds fire-lost homes in Pacific Palisades?

Kasimov Construction is a licensed general contractor (CSLB #1148319, Class B) that rebuilds homes lost in the January 2025 Palisades Fire in Pacific Palisades, ZIP code 90272. Rebuilds are permitted by LADBS under the Mayor's Executive Order 1 (like-for-like within 110% of the old footprint and height) or Executive Order 8 (zoning-compliant homes in the Coastal Zone) and are built to the California Wildland-Urban Interface Code. The team has been in construction since 2008 and signs a fixed-price contract.

Kasimov Construction · Pacific PalisadesKey facts
License
CSLB #1148319, Class B, bonded and general liability insured · verify
Permit office
LADBS (City of Los Angeles)
Rebuild paths
EO 1 like-for-like within 110% of footprint and height · EO 6 self-certification · EO 8 zoning-compliant in the Coastal Zone
Help in person
Palisades Inspections and Permitting Support Center, 16925 Marquez Ave, Mon-Fri 9 AM-5 PM, palisadespermitconcierge@lacity.org · One-Stop Rebuilding Center, 1828 Sawtelle Blvd, Mon-Fri 9-5
Fire code
California Wildland-Urban Interface Code (formerly Chapter 7A); Pacific Palisades a Very High Fire Hazard Severity Zone since 1999 (City Planning, code summary)
Fees
City permit and plan-check fees waived under Ordinance 188985 for owners at the time of the fire, up to 110% of the original floor area, repaid if sold before the certificate of occupancy; the owner still pays state surcharges and LAUSD fees on additions over 500 sq ft, which are not waived (LADBS fee guide)
Contract
Fixed price in writing, as CSLB requires for disaster rebuilds; deposit capped at $1,000 or 10%

Rules

Which rules apply to a Pacific Palisades rebuild?

Which rebuild path applies?

Most Palisades lots qualify for the Mayor's Executive Order 1, the like-for-like path: the same use in substantially the same location, within 110% of the original footprint and height. City departments aim to review a complete application within 30 days and issue clearances within 5 days. Those are targets, not guarantees, and we do not promise a permit date.

The 110% is measured on the footprint and the height, not on square footage. A new basement is allowed inside that footprint, and a detached garage can be moved and attached without counting toward the 110% as long as it stays under 400 sq ft (EO 1 guidelines v4.0). EO 1 projects have no Coastal Act, CEQA or Mello Act review (City Planning rebuild FAQ).

Keep the two 110% tests apart: EO 1 measures footprint and height, the fee waiver measures floor area (EO 1 guidelines v4.0, LADBS fee waiver guide); the full fee list is in our Palisades rebuild cost guide.

Can the plans be self-certified?

Under Executive Order 6, a California-licensed architect or civil engineer with at least three years of registration and errors-and-omissions insurance can certify the plans for an EO 1 single-family rebuild of up to three stories, and LADBS issues the permit without its own plan check. Lots in the Geologically Sensitive Areas are excluded. LADBS still inspects the construction and audits at least 10% of self-certified plans at random (self-certification guidelines).

What if the lot is in the Coastal Zone?

Executive Order 8 covers zoning-compliant single-family rebuilds in the Coastal Zone that do not fit the like-for-like box: the same number of units plus an optional ADU, no lot consolidation or subdivision, at least 10 ft from a canyon bluff and 25 ft from a coastal bluff. The permit has to be obtained within seven years of the order and the work completed within three years of the permit (EO 8 guidelines v2.0).

City Planning says EO 8 shortens what would have been an 18 to 24 month Coastal review to a few days or a couple of months. Where ZIMAS flags bluff potential, a California-licensed engineer or geologist prepares a bluff analysis on Form CP-3641 (City Planning rebuild FAQ, EO 8 guidelines, section III.A).

Are permit fees waived for owners?

For many owners, yes. The owner who held the property on the day of the fire pays no LADBS permit or plan-check fees, LAFD fees or Planning clearances on a rebuild up to 110% of the original floor area under Ordinance 188985, in force since July 16, 2026 (LADBS fee waiver guide). The waiver is repaid to the City if the house is sold before the certificate of occupancy, the program has a $90 million three-year ceiling (Council File 25-0006-S57), and state surcharges, the Strong Motion fee and LAUSD fees on additions over 500 sq ft stay in the budget.

Which code applies?

Pacific Palisades has been a Very High Fire Hazard Severity Zone since 1999 (City Planning), so the new house is built to the California Wildland-Urban Interface Code (formerly Chapter 7A): Class A roof, ember-resistant vents, ignition-resistant walls, multi-pane glazing with a tempered pane, rated doors and decks (code summary).

Under Governor's order N-29-25, as implemented in the City's EO 8 guidelines, rebuilds may use the 2022 code except the State Fire Marshal fire and life-safety requirements of the 2025 code, which still apply (EO 8 guidelines).

No statewide Zone 0 rule is in force as of October 2026: the Board of Forestry's emergency package was withdrawn at the Office of Administrative Law on September 8, 2026 (OAL emergency regulations list). If you want the first five feet around the house kept free of combustible material, we design it that way.

How long is the permit good for?

Once a rebuild permit is issued, the City expects the work to be completed within three years, subject to extension (City of LA rebuild FAQ). The Governor's order N-20-25 set the same three-year validity for building permits on fire-damaged lots (N-20-25).

The City has revised these orders and their guidelines several times since January 2025. This page reflects what we read on October 15, 2026, and we check your address against the current LADBS wildfire bulletins before we price the job.

Coastal Zone

Two City paths and the standard route.

What each path asks for in the Palisades, and what still applies.

PathWho qualifiesWhat it skipsWhat still appliesSource
Executive Order 1, like-for-likeSame use, substantially the same location, within 110% of the original footprint and height; houses, accessory structures and ADUsCoastal Act, CEQA and Mello Act review; most City clearancesLADBS plan check (or EO 6 self-certification), the WUI code, soils rules and inspectionsEO 1 guidelines
Executive Order 8, zoning-compliant single-family in the Coastal ZoneSingle-family homes that meet every objective zoning standard; same unit count plus an optional ADU; 10 ft from a canyon bluff and 25 ft from a coastal bluffCoastal Act, CEQA and Mello Act reviewFull LADBS plan check, a bluff analysis where ZIMAS flags it, permit within seven years of the order and completion within three years of the permitEO 8 guidelines
Everything elseAny Coastal Zone project that does not fit EO 1 or EO 8No special pathA Coastal Exemption with a 20-working-day Coastal Commission appeal period, a Categorical Exclusion with a 10-working-day review, the Palisades Highlands permit CDP A-381-78, or a full Coastal Development Permit; Single vs Dual Permit Jurisdiction shown in ZIMASEO 8 guidelines, III.B

Summarized from the EO 8 Implementation Guidelines (section III.B). We confirm the jurisdiction for your lot in ZIMAS at the first visit.

How it works

From a cleared Pacific Palisades lot to move-in.

Six steps for a City of Los Angeles lot, with the schedule written into your contract before construction starts. Sources: City Planning rebuild FAQ, LADBS P/BC 2026-157 and the City of LA rebuilding guide.

  1. 01

    Lot visit and records

    We walk the lot, pull the old permits and Assessor records that LADBS uses to establish what stood there, and check ZIMAS for the Coastal Zone, bluff potential and the geohazard zone your address falls in.

  2. 02

    Corner survey and soils

    A surveyor marks the corners. Lots in the orange and yellow geohazard zones get combined geology and soils reports; outside them a soils report is needed only for deep excavations. If you want to keep any part of the foundation, a licensed engineer evaluates it first, and LADBS says fire-damaged footings usually cannot be reused.

  3. 03

    Plans, seen in 3D

    Licensed architects and engineers draw the house under Executive Order 1 or 8 to the LADBS wildfire plan-submittal checklist. You walk through it in 3D before anything is final, and our cabinet shop measures from the same drawings.

  4. 04

    Permits and utilities

    We submit to LADBS, or arrange self-certification where the lot qualifies, and answer every comment. At the same time we request the LADWP meter spot, hold the pre-construction meeting with the Electric Service Representative and schedule deliveries in LADOT's windows.

  5. 05

    Construction

    Foundation, framing, roof, systems and finishes to the California Wildland-Urban Interface Code, with cabinets from our own workshop. Your project manager sends a written update every week, and the site stays covered, swept and inside the property line.

  6. 06

    Final inspections and keys

    Final LADBS inspections, LADWP's release of permanent power, the certificate of occupancy, the walkthrough and a written 2-year workmanship warranty.

Fire-resistant construction

Built to the California Wildland-Urban Interface Code (formerly Chapter 7A).

Since January 1, 2026, the state's wildfire building rules are the California Wildland-Urban Interface Code (formerly Chapter 7A), and the State Fire Marshal's fire and life-safety requirements stay in force even where the rest of the house is built to the 2022 code (EO 8 guidelines). We build to the code and keep the inspection records in your project file.

Requirements summarized from LA County construction notes for fire hazard zones (2026).

What the wildfire code asks forCalifornia WUI Code
Roof
Class A roof covering; noncombustible gutters with leaf protection
Vents
Ember-resistant vents (ASTM E2886) or 1/16 to 1/8 in. metal mesh
Walls
Noncombustible or ignition-resistant siding, or a rated wall assembly
Windows
Multi-pane glass with at least one tempered pane
Doors
Noncombustible, 1-3/8 in. solid core or 20-minute rated
Decks
Ignition-resistant or noncombustible decking and stairs

Site conditions

Soils, foundations, power and access.

Soils and geology

LADBS bulletin P/BC 2026-157 sorts the Palisades into geohazard zones. Lots in the orange and yellow Palisades Geohazard Risk Assessment Zones need combined geology and soils reports approved by the Grading Division. Outside those zones a soils report is required only for excavations deeper than 5 ft or where the lateral support of a neighbor or the street is removed, and compaction may be certified by the consulting engineer instead of a grading inspection. A report approved within the last 10 years may be reused (LADBS P/BC 2026-157).

Foundations

Fire-damaged footings and slabs are not typically permitted to be reused: the heat changes the concrete and the steel, and debris-removal equipment often cracks what is left. A California-licensed structural engineer has to evaluate the foundation and LADBS has to approve it before any of it stays (City of LA rebuilding guide). We price a new foundation unless the engineer's evaluation says otherwise.

Power

LADWP is putting the Palisades distribution system underground where it can. Its Undergrounding Initiative spec (Rev. 01/2026) asks every rebuild for a combination overhead/underground service panel rated up to 400 A and one 3-inch conduit from the panel to the front property line, a meter spot requested early at ladwp.com/ams, and a pre-construction meeting with an Electric Service Representative. Permanent power is released only after the final LADBS and LADWP electrical approvals, which LADWP says can take a few days or a few weeks. We build to the spec and file the requests early, and we do not promise a reconnection date (LADWP undergrounding requirements).

Hydrants, deliveries and the jobsite

LAFD checks that the house is within 300 ft of a hydrant under LAMC 57.507, with a fire-sprinkler upgrade or a higher construction type as the usual alternatives, and LADOT asks that truck deliveries run 9 AM to 3 PM on weekdays and 8 AM to 6 PM on Saturdays (City of LA rebuilding guide).

The City is enforcing unpermitted work, storage in the public right-of-way, uncovered loads and construction runoff with notices of violation, fines and liens (Council District 11 update, August 15, 2026). Our crew keeps the site covered, swept and inside the property line, and every piece of work on the house is on the permit.

Status

Where the Palisades rebuild stands.

The Palisades Fire of January 7, 2025 destroyed 6,845 structures across Pacific Palisades and parts of Malibu and Topanga (CAL FIRE).

The Army Corps of Engineers began work on the last opt-in Palisades property on August 26, 2025, marking the final lot in the public debris-removal program (USACE, August 2025).

The first certificate of occupancy for a rebuilt Palisades home was issued on November 21, 2025 (Office of the Mayor).

The state's recovery data feed, with metrics stamped June 5, 2026, listed 5,257 rebuild applications in the City of Los Angeles, 3,859 plans approved and 3,221 permits issued (state recovery dashboard data feed); the dashboard page is updated at least monthly and may show newer figures. LADBS figures reported by FOX 11 on July 7, 2026 put rebuilding permits at 1,419 properties and certificates of occupancy at 28 (FOX 11). The two counts measure different things, permits versus properties, so they do not add up to one number.

We do not publish a percentage rebuilt or a days-to-permit figure. The sources disagree on what to count, and Executive Order 1's 30-day review is a target rather than a result (EO 1 guidelines).

Insurance

Working with your insurance.

Most Palisades rebuilds are paid for by a claim, so the claim's timeline is the project's timeline. Under California's rules for declared disasters your insurer pays additional living expenses for at least 24 months, with up to 12 more where permits, materials or contractor availability cause delays, and you have at least 36 months to collect the full replacement cost (California Department of Insurance notice). The full insurance timeline, and how we work with your adjuster, is on our fire rebuild page; the payout figures the Department has published for the Palisades Fire are in our Palisades rebuild cost guide.

Before you sign

What to verify before you sign.

The four checks specific to a Palisades lot. The checks that apply to every rebuild, license, fixed price, deposit cap, lien releases and the right to cancel, are in our guide to choosing a Palisades rebuild contractor.

  • Who files with LADBS. The contract names who submits to LADBS, who answers plan-check corrections and who goes to the Palisades Inspections and Permitting Support Center at 16925 Marquez Ave when a question needs a counter visit. We file under our license and answer the corrections.
  • Soils and compaction documents. LADBS bulletin P/BC 2026-157 sets which lots need combined geology and soils reports and lets the consulting engineer certify compaction elsewhere. Our price says who hires the engineer and includes the reports.
  • The LADWP panel and conduit. The combination overhead/underground service panel rated up to 400 A, the 3-inch conduit to the front property line, the meter-spot request and the pre-construction meeting (LADWP requirements, Rev. 01/2026) are in our scope and on our schedule.
  • Fee-waiver eligibility. The City waives permit and plan-check fees only for the owner at the time of the fire and only within the ordinance's floor-area limit, and the waived fees are repaid if the home is sold before the certificate of occupancy (LADBS fee waiver guide). We check both 110% tests against the Assessor's record before the plans are drawn.

Reviews

What our clients say.

Google Reviews
5.0

Our rating on Google. Read what clients wrote, or leave a review of your own.

Google
“We hired this team to convert part of our garage into a laundry area, a guest bathroom, and a shower. They did an amazing job! The tile work, wood accent walls, and vanity turned out great. The guys worked very clean and neat, kept the place tidy every day, and finished everything on time. Highly recommend them!”
GeorgiiGoogle review · October 2026Garage conversion: bath and laundry
Google
“Great contractor! Did our apartment bathroom remodel. Clear communication, quality work. Would definitely hire again!”
Vlad IglinGoogle review · October 2026Apartment bathroom remodel
Google
“Excellent work on room renovation! The room looks amazing, and I’m very happy with the results. Highly recommend!”
Artur RyzhkouGoogle review · October 2026Room renovation

All reviews →See them on Google →

FAQ

Palisades Fire rebuild questions, answered.

Call us: (424) 455-6464
Do you rebuild homes in Pacific Palisades?
Yes. Kasimov Construction is a licensed Class B general contractor (CSLB #1148319, verify on cslb.ca.gov) and treats a Palisades rebuild as new construction from the foundation up: survey and soils, plans, LADBS permits, construction to the California Wildland-Urban Interface Code and the certificate of occupancy, under one fixed-price contract as CSLB requires after a declared disaster.
What are the City of Los Angeles rules for a Palisades rebuild?
Three Mayor's orders cover most lots. Executive Order 1 is the like-for-like path: the same use in substantially the same location, within 110% of the old footprint and height, with a 30-day review target. Executive Order 6 lets a licensed architect or civil engineer self-certify the plans for a qualifying EO 1 single-family rebuild, with LADBS still inspecting and auditing at least 10% of plans. Executive Order 8 covers zoning-compliant single-family homes in the Coastal Zone that do not fit the like-for-like box. EO 1 and EO 8 projects have no Coastal Act, CEQA or Mello Act review.
Can I rebuild bigger than 110%?
Yes, if the house meets every objective zoning standard: in the Coastal Zone that is the Executive Order 8 path, and elsewhere the design goes through the standard LADBS review. Remember that EO 1's 110% is a footprint-and-height test, not a square-footage test, so a basement inside the footprint, or a second story that stays within the height allowance, can still count as like-for-like (City Planning rebuild FAQ).
Can my architect self-certify the plans?
If the project is an EO 1 like-for-like single-family rebuild of up to three stories and the lot is outside the Geologically Sensitive Areas, yes. The architect or civil engineer needs at least three years of California registration and errors-and-omissions insurance, LADBS skips its own plan check, still inspects the construction and audits at least 10% of self-certified plans (LADBS self-certification guidelines).
Can I use one of the City's pre-approved standard plans?
Yes, where one suits the lot. Executive Directive 13 of July 23, 2025 set up the Standard Plan Pilot Program, a public library of single-family designs submitted by architects and builders in answer to the City's open call (Executive Directive 13); the first approvals were announced on November 13, 2025 (Office of the Mayor), and designs are added on a rolling basis. LADBS approves a standard plan only after verifying it against the Building, Residential, Green Building and Energy Codes, which is what shortens plan check. Two things do not change: the plans are privately owned, so you license a copy from the designer, and every standard plan still gets a final LADBS review for site-specific conditions and clearances before the permit is issued; local soils may call for site-specific foundation or structural engineering (LADBS Standard Plan Program). The City has not published a count of approved plans. If you choose one, we check it against your parcel in ZIMAS and the geohazard map before you buy it, and build it under the same fixed price as a custom design.
My house was built to the 2019 code. Can it be rebuilt from the old plans?
Possibly, and the decision is LADBS's. Paragraph 8 of the Governor's order N-20-25 of February 13, 2025 allows a home that was designed and built to the 2019 California Building Standards Code and destroyed in the fire to be rebuilt to the same design without additional plan review, at the discretion of the local enforcing agency; the flood elevation standards of the 2022 code and any required elevation certificate still apply (N-20-25). The City's rebuild FAQ puts it this way: the plans can be resubmitted without further plan check, provided they are re-stamped by the original architect of record, and a house designed under an earlier code is rebuilt to the current code. Getting the old plans is simpler than it was: N-20-25 also suspended the state rule that required the City to seek the designer's consent before releasing them, and LADBS releases a lost home's plans to the owner by email or at the One-Stop Rebuilding Center with a government ID, the recorded deed and the request form (City of LA rebuild FAQ). We pull the permit history at the lot visit, and if the design qualifies we ask the architect of record to re-stamp it before anything is redrawn.
My lot is in the Coastal Zone. Does that slow the rebuild?
Not if the project qualifies under Executive Order 1 or Executive Order 8: those projects have no Coastal Act, CEQA or Mello Act review (EO 8 guidelines). Anything else goes through the standard coastal process: a Coastal Exemption with a 20-working-day Coastal Commission appeal period, a Categorical Exclusion with a 10-working-day review, the Palisades Highlands permit CDP A-381-78, or a full Coastal Development Permit (EO 8 Implementation Guidelines, section III.B). Whether your lot is in the Single or Dual Permit Jurisdiction is shown in ZIMAS, and we check it at the lot visit.
Do I qualify for the City fee waiver?
If you held the property at the time of the fire, yes: Ordinance 188985, effective July 16, 2026, waives City permit and plan-check fees up to 110% of the original floor area (LADBS fee waiver guide). A lot bought after January 7, 2025 does not qualify (City of LA rebuild FAQ), and if the qualifying owner sells before the certificate of occupancy, the waived fees are repaid to the City (Council File 25-0006-S57). The charges that stay even for a qualifying owner are listed in the rules section above.
Can my old foundation be reused?
Usually not. LADBS says fire-damaged footings and slabs are not typically permitted to be reused; a licensed structural engineer has to evaluate the foundation and LADBS has to approve it (City of LA rebuilding guide, P/BC 2026-157). We arrange the evaluation before we price the job and price a new foundation unless the engineer says otherwise.
Can I build an ADU first?
Yes. Under EO 1 or EO 8 an ADU can be built with, before or after the house, and it does not count against the residential floor area. A detached ADU is by-right with no coastal permit when it sits at least 10 ft from a canyon bluff and 25 ft from a coastal bluff (City Planning rebuild FAQ, EO 8 guidelines, section I.C). Under the Governor's order N-9-25 the ADU can receive its certificate of occupancy before the main house (N-9-25), so a family can live on the lot while the house goes up. The units we build, on cleared lots and next to standing houses, are described on our Pacific Palisades ADU page.
Can I live on the lot while the house is rebuilt?
Yes, one temporary unit per lot. LADBS bulletin P/BC 2026-156, effective January 1, 2026, allows a DMV-registered RV or movable tiny house, an HCD-approved mobile home or a HUD-approved manufactured home on a lot that is vacant, free of hazards and held a one- or two-family home destroyed or substantially damaged by the fire. The unit keeps a 5-ft setback from every property line; a unit on wheels sits on a grade of 5% or less, and anything else on an approved foundation system. No building permit is needed when an architect, contractor or engineer certifies through the LADBS online portal that the conditions are met, but the electrical, water and sewer connections need a permit and inspection, and a temporary sewage tank is emptied at least every five days. The unit may stay for up to three years, or as long as an active rebuild permit covers the lot, whichever is longer (P/BC 2026-156, City of LA rebuild FAQ). We plan the construction fence, the deliveries and the utility trenches around it so the two can share the lot.
Is there a deadline?
The City's rebuild FAQ says the main-house permit has to be obtained within seven years of the effective date of the applicable order, EO 1 or EO 8, and the work completed within three years of permit issuance, subject to extension (City of LA rebuild FAQ, EO 8 guidelines). The two-year application window you may have read about is an LA County rule for unincorporated Altadena (County rebuild FAQ); it does not apply to City lots in the Palisades.
What does LADWP require, and when is power reconnected?
LADWP's undergrounding spec asks for a combination overhead/underground service panel rated up to 400 A, one 3-inch conduit from the panel to the front property line, an early meter-spot request and a pre-construction meeting with an Electric Service Representative. Permanent power is released after the final LADBS and LADWP electrical approvals, which LADWP says can take a few days or a few weeks (LADWP requirements, Rev. 01/2026). We build to the spec and file early; the release date is LADWP's to set.
How far along is the Palisades rebuild?
Only dated official figures: the first certificate of occupancy was issued on November 21, 2025 (Mayor); the state's recovery data feed, with metrics stamped June 5, 2026, listed 5,257 City of Los Angeles rebuild applications, 3,859 plans approved and 3,221 permits issued (state dashboard data feed, newer figures may appear on the dashboard page); and on July 7, 2026 FOX 11 reported LADBS figures of permits for 1,419 properties and 28 certificates of occupancy (FOX 11). We do not publish a percentage rebuilt.
How long does a Palisades rebuild take?
Only your contract can answer that: it carries the written schedule, and your project manager reports against it every week. The published windows are these: City departments aim to review a complete Executive Order 1 application within 30 days (EO 1 guidelines); once the permit is issued, the City expects the work to be completed within three years, subject to extension (City of LA rebuild FAQ); and LADWP says permanent power is released a few days or a few weeks after the final electrical approvals (LADWP requirements). The time on site depends on the house, the soils reports and the plan-check round, and we tell you how long before you sign.
What does a Palisades rebuild cost?
Kasimov Construction does not publish prices. You get one fixed price in writing after the lot visit and the plans, as CSLB requires for rebuilding after a declared disaster. The public figures, the insurance payouts reported by the California Department of Insurance, the City fee waiver with its caveats and the items that move the number on a Palisades lot, are in our Palisades rebuild cost guide.
Do you help with the insurance claim?
We give you a detailed, line-item estimate and talk construction with your adjuster. We don't negotiate claims. That takes a licensed public adjuster or an attorney.
How much is the deposit?
California law caps the down payment on a home improvement contract at $1,000 or 10% of the contract price, whichever is less. After that, you pay as the work gets done, on the schedule written in your contract.

Free estimate

Tell us about your Pacific Palisades lot.

Address, what was there before and where you are with insurance and permits. We'll call you to set up a visit to the lot.

  • Free estimate visit: we measure and listen
  • Written estimate with a clear scope
  • One project manager from start to finish
  • CSLB #1148319, licensed, bonded & insured
  • 2-year written warranty on workmanship
Step 1 of 4What are you planning?
Step 2 of 4When would you like to start?
Step 3 of 4What budget do you have in mind?

Kitchen remodeling from $20,000. Bathroom remodeling from $15,000. Final pricing depends on scope. Not sure? Choose “Not sure yet.”

Step 4 of 4Where should we send your estimate?

Call Free Estimate