How to Choose a Contractor for a Palisades Fire Rebuild

What the Contractors State License Board, Cal OES and Los Angeles County tell fire survivors to check before they sign a rebuild contract: the license, the contract type, the deposit, the payment schedule, lien releases and the right to cancel. Every rule links to its source, and we answer each check for our own company.

Licensed, bonded & insured · CSLB #1148319 Fixed price in writing · 2-year warranty Permits handled
Floor plans, drafting tools and material samples on a desk

What should you check before hiring a Palisades rebuild contractor?

Check for an active Class B license (CSLB). Get three written bids and call references (Cal OES). Insist on a fixed price; CSLB treats a post-disaster rebuild as home improvement work and bars time-and-materials and cost-plus contracts. The deposit is capped at $1,000 or 10%, payments may not run ahead of the work, lien releases come with each payment, and you have seven business days to cancel. Kasimov Construction (CSLB #1148319, Class B) answers each check below.

Rules for hiring a rebuild contractorKey facts
License
Active CSLB license, number on every ad, card and contract (CSLB) · verify at cslb.ca.gov
Class
Class B, General Building, for a house (CSLB classifications)
Contract type
Fixed price in writing; no time-and-materials or cost-plus (CSLB)
Deposit cap
$1,000 or 10% of the price, whichever is less (B&P 7159.5)
Payments
Only for work completed or materials delivered (CSLB bulletin)
Cancellation
7 business days for repairs in a declared disaster area (Cal OES, County workshop)
Price gouging
PC 396(c): no more than 10% above pre-emergency prices for repair and reconstruction (Attorney General). County protections expired May 28, 2026; City of LA protections remained per the City Attorney report of June 22, 2026; confirm current status
Hotlines
CSLB disaster hotline 800-962-1125 (CSLB) · LA County DCBA (800) 593-8222 (County workshop) · DCBA rebuilding guide

Step by step

Seven steps.

Each step links to the rule it comes from: CSLB, Cal OES and the LA County rebuilding workshop of September 13, 2025.

  1. 01

    Verify the license and classification

    Look up the number on CSLB's License Check: active status, Class B, the bond line and the workers' compensation line (a contractor with no employees is listed as exempt; ask how the people on your lot are covered). Ask to see the pocket license and a photo ID.

  2. 02

    Get three bids on the same scope

    Cal OES and CSLB both say at least three written bids on the same plans, with references you call. Be careful with a bid far below the others.

  3. 03

    Check the bond and insurance certificates

    Every licensee carries a $25,000 license bond, which covers all of the contractor's jobs together. Ask for the certificate of general liability insurance before work starts, and ask how everyone who will work on your lot is covered for injuries.

  4. 04

    Read the contract against B&P 7159

    The CSLB consumer guide lists what a home improvement contract must contain: the total price, start and completion dates, the deposit notice, a schedule of progress payments, the Mechanics Lien Warning and your right to cancel.

  5. 05

    Agree the payment schedule and lien releases

    Each payment names the work it covers and never runs ahead of it (CSLB bulletin). A conditional release comes before you pay and an unconditional release after, from everyone the payment covers.

  6. 06

    Confirm who files with LADBS and who requests the LADWP meter spot

    The contract says who submits to LADBS, who answers corrections and who requests the LADWP meter spot and the pre-construction meeting with the Electric Service Representative.

  7. 07

    Keep the right to cancel and every change order in writing

    Seven business days to cancel a disaster repair contract, by written notice (Cal OES, County workshop). Change orders are signed, with the price and schedule change, before the extra work starts (CSLB guide).

Verification

How do you verify a contractor's license and classification?

Use CSLB's free License Check. Search by license number, business name or personal name, then read the status (it should say active), the classification, the bond line and the workers' compensation line (a contractor with no employees is listed as exempt; ask how the people on your lot are covered). For a house, the classification to look for is B, General Building. Cal OES lists A, B and C licenses as the types fire survivors should be working with, and LA County's rebuilding workshop names Class B as the classification for home rebuilding (Cal OES, County workshop slides, CSLB classifications). LA County's Department of Consumer and Business Affairs adds that every professional on a rebuild should be checked with its own board before hiring: the contractor with CSLB, the architect with the California Architects Board, and engineers, surveyors and geologists with theirs (DCBA rebuilding guide).

The license number has to appear on every ad, business card and contract, and CSLB asks homeowners to hire a licensed contractor for any repair or rebuilding project of $1,000 or more, labor and materials included (CSLB release of January 17, 2025). When the contractor visits, ask to see the pocket license and a photo ID, and check that the person in front of you is listed on the license (CSLB). Every licensee carries a $25,000 license bond, which covers all of that contractor's jobs together, so ask for the insurance certificates as well.

Kasimov Construction is CSLB #1148319, Class B. You can verify the license on cslb.ca.gov.

Contract

Why must a Palisades rebuild contract be fixed price?

Because CSLB requires it. The board treats rebuilding a home after a wildfire or another declared disaster as a home improvement project, so the contractor has to follow every home improvement contract and payment rule rather than treating the job as new construction. The contract must be a fixed-price contract that lists the full agreed price for the project; time-and-materials and cost-plus contracts are not allowed for disaster-related home improvement work, and the same rules cover ADUs and solar (CSLB Disaster Help Center).

A fixed price protects you only when the scope is written down with it. Business and Professions Code 7159 lists what the contract must contain: the contractor's name, address and license number, approximate start and completion dates, the total price, the down payment with its bold-type notice, a schedule of progress payments that names the work each payment covers, a description of the work and the main materials, the Mechanics Lien Warning and the notice of your right to cancel (CSLB consumer guide). If a contractor cannot meet these terms, CSLB's advice is to seek other bids (CSLB).

Payments

How much can a contractor ask for up front?

No more than $1,000 or 10% of the contract price, whichever is less (Business and Professions Code 7159.5). On a rebuild that means $1,000. Cal OES and CSLB both repeat the cap in their guidance for fire survivors (Cal OES, CSLB).

Progress payments

After the deposit, each payment has to match work completed or materials delivered to the site, and the contract has to carry a schedule of progress payments with the statutory notice that it is against the law for a contractor to collect payment for work not yet completed, or for materials not yet delivered (CSLB industry bulletin). Pay by check or card so there is a record; CSLB and Cal OES both say never to pay cash (CSLB, Cal OES). Keep a job file with the contract, the correspondence and a copy of every payment, and hold the final payment until the work is finished to your satisfaction (CSLB).

Your rights

Can you cancel after signing?

Yes, for a short time, and longer than usual after a disaster. A contract to repair or rebuild a home damaged in a declared disaster can be cancelled within seven business days of signing, in writing and without penalty (Cal OES, County workshop slides); the usual window is three business days, or five if you are 65 or older (CSLB). The contractor has to give you a written notice of the right (County workshop slides) and return your payments within 10 days of receiving your cancellation (Civil Code 1689.10). You do not have to give a reason (County workshop slides).

Use the window: seven business days is enough time to run the License Check, call the references and read the contract against the list above.

Paperwork

How do you protect yourself from mechanics liens?

Anyone who works on the house or delivers materials and is not paid can record a mechanics lien against your property, even if you paid the general contractor in full (CSLB). The protection is paperwork, done in order:

  • Preliminary notices. Trade contractors and suppliers keep their lien rights by sending you a preliminary notice within 20 days of starting work or delivering materials. Keep every one and note the date (CSLB).
  • Conditional release before you pay, unconditional release after. The forms follow Civil Code 8132 to 8138, and a conditional release takes effect only once the claimant is actually paid (CSLB release forms). By law you can hold the next payment until you have the unconditional releases for the previous one (CSLB).
  • Joint checks. Pay anyone who sent a preliminary notice with a check made out to them and the contractor together (County workshop slides).
  • Notice of Completion. Record it with the county within 15 days of finishing. It shortens the time to record a lien from 90 to 60 days for the contractor and from 90 to 30 days for everyone else (CSLB).

Pacific Palisades

Which Palisades-specific questions should you ask?

These questions come from the City's own rebuild rules, and a Palisades bid should answer them. What moves the number itself is in our Palisades rebuild cost guide. If your lot is in unincorporated Altadena, the County asks different questions, and they are on our Altadena rebuild page. Ask each Palisades bidder:

  • Which path does the bid assume? Executive Order 1 covers a like-for-like rebuild within 110% of the old footprint and height; Executive Order 8 covers a zoning-compliant single-family home in the Coastal Zone. The path sets the review, the Coastal paperwork and the schedule, so the bid should name it.
  • Who prepares the soils and compaction documents? LADBS bulletin P/BC 2026-157 requires combined geology and soils reports on lots in the orange and yellow geohazard zones and lets the consulting engineer certify compaction elsewhere. The contract should say who hires the engineer and whose price includes the reports.
  • Who makes the LADBS submittal and answers corrections? Ask who files, who answers plan-check comments and who goes to the Palisades Inspections and Permitting Support Center at 16925 Marquez Ave when a question needs a counter visit (LADBS wildfire information).
  • Are the LADWP panel and conduit in the scope? LADWP's undergrounding requirements call for a combination overhead/underground service panel rated up to 400 A, one 3-inch conduit from the panel to the front property line, an early meter-spot request and a pre-construction meeting with the Electric Service Representative (LADWP, Rev. 01/2026). Two bids compare only when both include them.
  • Are the wildfire-code assemblies itemized? Pacific Palisades has been a Very High Fire Hazard Severity Zone since 1999 (City Planning), so the house is built to the California Wildland-Urban Interface Code (formerly Chapter 7A): Class A roof, ember-resistant vents, ignition-resistant walls, multi-pane glazing with a tempered pane, rated doors and decks (code summary). Ask for them line by line.
  • Does the bid assume a new foundation? LADBS says fire-damaged footings and slabs are not typically permitted to be reused without a licensed engineer's evaluation and LADBS approval (City of LA rebuilding guide). A bid that keeps the old slab should say who evaluated it.
  • Can the ADU go first, and is it priced as its own structure? Under Executive Order 1 or 8 an ADU may be built with, before or after the house and does not count against its floor area, and under the Governor's order N-9-25 it can receive its certificate of occupancy before the house does (City Planning rebuild FAQ, EO 8 guidelines, section I.C, N-9-25). If you plan to live on the lot during construction, the bid should sequence the ADU first and carry its foundation, utility connections and wildfire-code assemblies as their own lines. What we build is on our Pacific Palisades ADU page.

Enforcement

What are the penalties for unlicensed contracting after a fire?

Contracting without a license on a structure damaged or destroyed in a disaster for which the Governor has proclaimed a state of emergency is a felony under Business and Professions Code 7028.16. The Los Angeles County District Attorney, announcing charges against unlicensed contractors in the Eaton Fire zone in December 2025, put the penalty at up to three years in prison and/or a $10,000 fine (LA County District Attorney). The California Attorney General's fire-recovery page carries the same warning: anyone who acts as a contractor in a federal or state disaster area without an active license could face felony charges (Attorney General).

If someone offers to work on your lot without a license, CSLB's Disaster Help Center has a form to report a contractor working at a rebuild site, and its disaster hotline is 800-962-1125, Monday to Friday 8 to 5 (CSLB).

Prices

Is price gouging still banned?

In part, and the answer depends on the date and the jurisdiction. Penal Code 396(c) makes it unlawful for a contractor to charge more than 10% above the price it charged for repair or reconstruction services immediately before the emergency was declared, unless the increase is directly attributable to higher supplier, labor or material costs (California Attorney General). Cal OES repeats the 10% rule in its guidance for fire survivors (Cal OES). The rule itself is settled; what to confirm is whether a declaration keeps it in force on the day you sign.

The protections run on emergency declarations, and those have different end dates. Los Angeles County extended its own protections month by month and let them expire on May 28, 2026, while the City of Los Angeles kept its local emergency in force, so, in the words of the City Attorney's report of June 22, 2026, price-gouging protections remain in effect within the City (City Attorney report). Pacific Palisades is inside the City. We have not seen a later official statement, so confirm the current status with the LA County Department of Consumer and Business Affairs at (800) 593-8222 or the Attorney General's office before you rely on it (County workshop slides, Attorney General).

Our answers

How Kasimov Construction answers each check.

The checks above, answered for our own company. Kasimov Construction has been in construction since 2008 and holds an active Class B license, CSLB #1148319, bonded and general liability insured (verify). We sign a fixed-price contract for a rebuild, as CSLB requires, with allowances listed line by line and a written change order before anything changes. The deposit stays under the legal cap, each progress payment is tied to work completed, and lien releases come with the payments. We file the permit with LADBS under our license and answer the corrections, and a dedicated project manager sends you a written update every week. Kasimov Construction doesn't publish a price list. You get a written fixed price for your project after a free estimate visit.

Kasimov ConstructionCheck by check
License
CSLB #1148319, Class B, active, bonded, general liability insured · verify
Contract
Fixed price in writing, allowances listed line by line, written change orders only
Payments
Deposit under the legal cap, progress payments tied to completed work, lien releases
Permits
We file with LADBS and answer corrections
Communication
Dedicated project manager, written update every week
Warranty
Written 2-year workmanship warranty
Insurance
Certificates of insurance before work starts
Experience
In construction since 2008
  • No license number on the bid, card or ad. It is required on all of them (CSLB).
  • Cash only. CSLB and Cal OES both say never to pay cash; use a check or card that leaves a record (Cal OES).
  • A large deposit. Anything over $1,000 or 10% of the price, whichever is less, is over the legal limit (B&P 7159.5).
  • Pressure to sign over the insurance check. CSLB's first tip after the fires: do not sign over any payment checks from your insurer (CSLB).
  • An offer to work under your name as owner-builder. You would take on the builder's legal duties and could become the employer of everyone on the lot (CSLB).
  • Time-and-materials or cost-plus pricing. Not allowed for disaster rebuilding, which CSLB treats as home improvement work (CSLB).
  • Pressure to decide today. CSLB says not to rush and not to hire the first contractor who comes along (CSLB).
  • No written contract, or a bid far below the others. A handshake is not binding, and a very low bid may hide costs or poor work (County workshop slides).

FAQ

Hiring questions for a Palisades rebuild.

Call us: (424) 455-6464
Is it legal to hire an unlicensed contractor for a fire rebuild?
Not for the contractor. Contracting without a license on a structure damaged in a disaster for which the Governor proclaimed a state of emergency is a felony under Business and Professions Code 7028.16, which the LA County District Attorney puts at up to three years in prison and/or a $10,000 fine (District Attorney, December 2025). CSLB asks homeowners to hire a licensed contractor for any repair or rebuilding project of $1,000 or more, and warns that unlicensed operators usually carry no workers' compensation insurance, which leaves the homeowner exposed if someone is hurt on the lot (CSLB, January 2025).
Do I need a Class B contractor?
For a house, yes. Class B, General Building, is the classification for home rebuilding; a C-class specialty contractor is licensed for a single trade such as roofing or plumbing, and Class A is general engineering for infrastructure, utilities and grading (LA County rebuilding workshop, CSLB classifications). Cal OES lists A, B and C licenses as the types survivors should be working with (Cal OES). Check the classification on the CSLB license page before you compare bids.
Can the contractor also handle the insurance claim?
No. A contractor gives you a detailed, line-item estimate that your adjuster can compare with the insurer's scope, and answers the adjuster's construction questions. Negotiating the claim itself is work for you, a licensed public adjuster or an attorney. That is how we handle it too.
Should I sign the insurance check over?
No. The first item in CSLB's tips for hiring a contractor after the January 2025 fires is not to sign over any payment checks from your insurance company (CSLB, January 2025). Payments follow the schedule in the contract, each one for work completed or materials delivered (CSLB bulletin).
What deposit is legal?
No more than $1,000 or 10% of the contract price, whichever is less (Business and Professions Code 7159.5). On a rebuild that means $1,000. CSLB repeats the cap in its guidance for fire survivors and adds that any other payment must be listed in the contract and based on the actual value of work completed or materials delivered (CSLB Disaster Help Center). Kasimov Construction doesn't publish a price list. You get a written fixed price for your project after a free estimate visit.
How many bids should I get?
At least three written bids on the same plans and scope, with references you call. That is the advice of both Cal OES and CSLB, and both add that the lowest bid is not automatically the one to take, especially when it is far below the others (Cal OES, CSLB).
How long do I have to cancel?
Seven business days for a contract to repair or rebuild a home in a declared disaster area, in writing and without penalty (Cal OES, LA County rebuilding workshop); the usual window is three business days, or five if you are 65 or older (CSLB). The contractor has to give you a written notice of the right, and you do not have to give a reason (LA County rebuilding workshop).

Free estimate

Talk to a licensed contractor about your lot.

Tell us the address and where you are with insurance and permits. We set up a visit to the lot, and you get a written scope and one price in writing before anything is signed.

  • Free lot visit: we measure and listen
  • Written scope and one price in writing
  • One project manager from start to finish
  • CSLB #1148319, licensed, bonded and insured · verify
  • 2-year written warranty on workmanship
Step 1 of 4What are you planning?
Step 2 of 4When would you like to start?
Step 3 of 4What budget do you have in mind?

Kitchen remodeling from $20,000. Bathroom remodeling from $15,000. Final pricing depends on scope. Not sure? Choose “Not sure yet.”

Step 4 of 4Where should we send your estimate?

Call Free Estimate